dc.contributor.advisor | García Pérez, Víctor | |
dc.contributor.author | Curitima Yuyarima, Daniel Fernando | |
dc.contributor.author | Torres Tangoa, Antony Jack | |
dc.contributor.author | Barriga Chumbe, Eduar Janel | |
dc.date.accessioned | 2018-03-16T18:03:11Z | |
dc.date.available | 2018-03-16T18:03:11Z | |
dc.date.issued | 2017 | |
dc.identifier.other | 628.44564 C95 2017 | es_PE |
dc.identifier.uri | http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/5316 | |
dc.description.abstract | El objetivo del proyecto, es estimar la viabilidad técnica y económica a nivel de prefactibilidad para la instalación de un relleno sanitario en la región Loreto.
El estudio de mercado estimó una demanda insatisfecha de 121 579 TM de residuos sólidos a reciclar, orgánicos e inorgánicos para el año 2022.
La ingeniería del proyecto, muestra el estudio de la materia prima, describe el proceso productivo, muestra los balances de materia y energía, especificaciones de los equipos, área necesaria requerida por el proyecto y el estudio de impacto ambiental.
La organización del proyecto describe las áreas, secciones que comprende; funciones, responsabilidades y muestra el organigrama de la empresa.
El proyecto requiere una inversión de US$ 8 150 000, el mismo que estará cubierto en un 90 por ciento por COFIDE-BANCO CONTINENTAL, que asciende a US$ 7 335 000 y el 10 por ciento de aporte propio, que equivale a US$ 815 000 de la inversión total.
El presupuesto de caja muestra los probables ingresos y egresos del proyecto para los años 2017 – 2022, además se determinó el punto de equilibrio con un PEc = 94.79 TM.
Para la evaluación económica del proyecto, se empleó los indicadores económicos del VAN, TIR, B/C y el periodo de recuperación de la inversión, coincidiendo con una viabilidad positiva. Con un VANE de 3 595 429,01, el TIRE de 30.86 por ciento. La relación B/C es de 1.44 y un periodo de recuperación de la inversión de 3.13 años. También se explica el estudio de impacto ambiental, así como las conclusiones y recomendaciones del estudio, al igual que la bibliografía empleada. | es_PE |
dc.description.abstract | The objective of the project is to estimate the technical and economic feasibility at the pre-feasibility level for the installation of a landfill in the Loreto region.
The market study estimated an unsatisfied demand for 121 579 MT of solid waste to be recycled, organic and inorganic by 2022.
The engineering of the project, shows the study of the raw material, describes the production process, shows the material and energy balances, equipment specifications, required area required by the project and the environmental impact study.
The organization of the project describes the areas, sections comprising; Functions, responsibilities and shows the organizational chart of the company.
The project requires an investment of US $ 8 150 000, the same that will be covered 90% by COFIDE - BANK CONTINENTAL, which amounts to US $ 7 335 000 and 10% of own contribution, equivalent to US $ 815 000 Of total investment.
The cash budget shows the probable revenues and expenditures of the project for the years 2017-2022, in addition the break - even point was determined with PEc = 94.79 MT.
For the economic evaluation of the project, the economic indicators of the NPV, IRR, B / C and the period of recovery of the investment were used, coinciding with a positive viability. With a NEPV of 3 595 429,01, the IERR of 30.86%. The B / C ratio is 1.44 and an investment recovery period of 3.13 years. It also explains the environmental impact study, as well as the conclusions and recommendations of the study, as well as the literature used.
xv | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional de la Amazonía Peruana | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.source | Universidad Nacional de la Amazonía Peruana | es_PE |
dc.source | Repositorio institucional - UNAP | es_PE |
dc.subject | Estudio de factibilidad | es_PE |
dc.subject | Viabilidad | es_PE |
dc.subject | Proyecto piloto | es_PE |
dc.subject | Tratamiento de residuos | es_PE |
dc.title | Estudio de prefactibilidad para la instalación de un relleno sanitario en el distrito de San Juan Bautista - región Loreto | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.discipline | Ingeniería Química | es_PE |
thesis.degree.grantor | Universidad Nacional de la Amazonía Peruana. Facultad de Ingeniería Química | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.name | Ingeniero Químico | es_PE |
thesis.degree.program | Regular | es_PE |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.04.01 | es_PE |